WBPSC JE Online Mock test Comming Soon | WBPSC JE expected Eaxm date-09/07/2023 | WBKMC - SAE (Sub Assistant Engineer) Exam date : 25/06/2023 (Sunday)

Surveyivng Practice | Set -3 | Plane Table Surveyig

1. When every the station changes in plane table surveying, the operation must be done _






2. Bevelled edge is related to which of the instrument_






3. U –fork is used for __






4. Plane Table surveying works with the principle of _






5. Plan table map cannot be plotted with other scale, because _






6. The accuracy with which a plane table can be plotted is called_






7. If the plane table station set on the circumference of the greater circle then_






8. To established the instrument station, most the method is used _






9. Field measurement and plotting is don simultaneously in_






10. Instrument used to level the plane table _






Practice Set-1| Practice Set-2 | Practice Set-3 | Practice Set-4 | Practice Set-5 | Surveyig Practice MCQ | Home |