Surveying Practice | Set-02 | Chain Survey
MCQ Quiz
2. Which of the following details are not necessary to be given at the beginning of a particular surveying?
3. Two mirror are used in offsetting in_
4. Pick up the correct answer
5. When the offset is taken at distance more than 15 m for the survey line is called
6. Perpendicular offset can be can set by right angle in ratio off_
7. For indirect ranging and direct ranging, the minimum number of ranging rod required _
8. Offset are two type_
9. In survey execution, the very first step taken is_
10. Chainage is the distance measured _
Comments
Post a Comment